CRRC Railcar Factory

FACTS

AWARD:
2018 Massachusetts Economic Impact (MassEcon) Silver Award
2018 the National Recognition Award by the American Council of Engineering Companies (ACEC)
2018 New England’s Best Project by ENR
LOCATION:
Springfield, MA
YEAR OF COMPLETION:
2017
ROLE:
Design-Builder

KEYWORDS:

PROJECT DESCRIPTION

The project signals the Chinese railway equipment manufacturing industry’s launch in the United States and marks CCA’s entry into the Massachusetts construction market.

Served as the design-builder, the project team managed the process from the conceptual design through the final stage of construction and the installation of the assembly equipment for the state-of-art facility on a 40-acre site. The factory includes 205,000 square-foot High Bay Railcar assembly facility, and 2,240 foot dynamic test track, and the building is about 300 by 700 feet, which is big enough for three and a half football fields.

OTHER PROJECTS

NYC---150-Charles---02---Rendering-by-Hayes-Davidson

150 Charles Street

Manhattan, NY

NJ---Morristown-445-South-Street-Office-Building-01

445 South Street

Morristown, N.J.

99hudson 1

99 Hudson Street

Jersey City, NJ

aerial-with-city

Amador Convention Center

Panama City, Panama

8

Park and Shore

Jersey City, NJ

NJ---Kearny---Pulaski-Skyway---01

Pulaski Skyway

Newark, Town of Kearny and Jersey City, N.J.

River Bluff High School

River Bluff High School

Lexington, S.C.

Stitched Panorama

Riverhouse

Manhattan, NY

san-isidro-v2-27b

San Isidro Bus Station

San Miguelito, Panama

DC---Station-House---02---Photo-by-Ira-Wexler

Station House

Washington, DC

sky-rise-1

SkyRise Miami

Miami, FL

NY---New-York---Staten-Island-Expressway---01

Staten Island Expressway

Staten Island, NY

33

THE POINTE

Nassau, The Bahamas

USC Campuses

University of South Carolina

Columbia, S.C.; Aiken, S.C.

wardman-tower-1

Wardman Tower

Washington, DC

NJ---Wittpenn-Bridge-02

Wittpenn Bridge

Jersey City and Kearny, NJ